01
On-Site Measure
We walk the roofline, measure total run length, count downspout drops, and check the fascia for soft spots with a pry bar. You get a written price the same day, usually within an hour of the visit. No charge for the estimate.
02
Material and Color
You pick from standard aluminum colors or upgrade to steel. We confirm the profile, the downspout size, and whether you want guards. Seamless runs are formed on the truck in your driveway, so the length is exact and there are no mid-run joints.
03
Tear-Off and Prep
Old gutters come down and go in the trailer. We inspect the fascia board, replace any rotted sections, and reset the chalk line for correct fall. Hangers get marked every 24 inches so the run stays tight under load.
04
Hang and Seal
Runs go up, hangers get driven into solid wood, and every end cap and corner gets sealed with gutter sealant. Downspouts are fastened to the wall and extended to discharge well clear of the slab. This is the step that decides whether the system lasts.
05
Water Test and Walkthrough
We run water down the roof and watch every joint, corner, and downspout outlet. If anything weeps or pools, we fix it before we pack up. Then we walk the job with you, show you the discharge points, and leave the yard clean.